Repository navigation
Record the fixed N1 research start line and dated interim plans - #801
Closed
seathatflowsinourveins wants to merge 4 commits into
Closed
seathatflowsinourveins wants to merge 4 commits into
seathatflowsinourveins wants to merge 4 commits into
Conversation
4 of 6 tasks
Owner
Author
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Scope
The October 6 start-line record retains its decided text and historical observations. Dated October 7 amendments set the fixed S4 review/adjudication deadlines and define N1 data integrity as the opening unit, followed by N2 and N3 under their data gates.
a431870fecc76e5263ec658a799618ceaa5a20fb.79ada795b7e67f5eb802195b2ee80cfd82d4899d.lane:shared(existing label); trading custody/readback remains with 5f.evidence/artifacts/ns2604-start-line-20261007/interim-plans.json, current dashboard start strings and native-generated evidence registry.Resulting start terms
S4 review is due no later than 2026-10-08T04:00Z on the original 80-slot board as it stands; adjudication is due by 22:00Z. Only paper-engine safety or owner-only sign-in can hold it beyond that deadline. Open original gates receive the CC's dated dispositions, with no new gate or all-ready wait.
N1 inventories existing platform data-integrity capabilities and source limits, plans only referenced residual glue, and accepts through a NautilusTrader 2.0.0rc5 known-answer historical-data backtest. No strategy number precedes that acceptance. rnd-r1 owns N1; 5f owns trading-lane landing custody. N2 is the prospective D1 holdout with its October 14 validation opening; N3 is the catalyst Wave 1 rerun when data gates allow. SPY one_stress is a separate blocked mapping.
Dated readings cover native-sign-in Codex CLI N1 executors, the scoped gateway deviation, network/credential restrictions on research processes, actual R&D launch/zero-connector proof or exclusion, per-landing CC cues, entitled/public data, and outputs under lane:trading in this repository. They are re-checked at S4; no launch, sign-in or installation is asserted by this record.
The twelve original interim rows now have dated plan locators, verified source hashes, owners and next actions. Completion dates stay unknown where not committed. The essential profile remains a single planned
north-star-rndprojection inadoption/manifest.json, owned by grand-catalog on #820 after J820-FIX2, with one sourced basee712bae606e8d27f010af8e3c13ded6b7a7c207a. No second essential list or published-profile claim is introduced.SOTA sources
6685923cc99f4457d5c0afa35f0e48cb4295b568709519e2a12ad41bb678ab5c); profile projection remains assigned to Consolidate catalog evidence, organic controls and foundation records #820.6b0bde35825d0dbba8d55f1238cb0628621974eb41cb56b1f143580e7c3858e8; task-ns2604-coop-20261007T002252Z point 1 supplies the fixed dates and two hold reasons. These are adjudicated documentary authorities, not execution receipts.evidence/artifacts/ns2604-start-line-20261007/interim-plans.json.Evidence-class table
3e8cbc6285f077efa1254900dfed3fbcb676cd7f205ba6a228748f94adc0607c; 12 unique rows, matching retained source hashes/pointers; no completion date inventedLocal commands run
Only documentation, plan bindings and checkpoint text changed; no functional test module changed. The native registration API preserved every unrelated entry and manifest metadata. Content commit
9d82413precedes registry/checkpoint-last commit79ada795. One authorized push, no rebase, no host/provider/GPU/research job, and no readiness promotion. A canonical-source identifier typo was corrected only in the newly appended section.Decision record
docs/decisions/2026-10-06-north-star-start-line.md: existing decided text is retained verbatim, followed by dated amendments. The old conditional dates and campaign expectations remain historical; the new fixed ruling supersedes them.Landing path
Co-op exact-head read and CI at
79ada795, command-center ACK, then the CC's cue for the existing #801 slot ahead of the S4 review. The cue must reconcile #791's inherited stack and T10 dependencies; this update changes no other PR. No rebase until explicitly relayed by the co-op. Shared-lane trading acknowledgement/custody remains with 5f before merge.Host evidence
No host receipt or platform-status change. This PR states requirements and prospective plans, not passed native job gates.
Checklist